Skip to content

Browse

Read it straight through.

Search is the wrong tool when you do not yet know what to ask. Pick a jurisdiction to see which Parts are indexed and how much of each there is.

Occupational Health and Safety Regulation B.C. Reg. 296/97

634 sections · current to September 15, 2026 · official source ↗

  • Occupational Health and Safety Programs4
    • 3.1When program required
    • 3.2Small operations
    • 3.3Contents of program
    • 3.4Repealed(repealed)
  • Workplace Inspections4
    • 3.5General requirement
    • 3.6Repealed(repealed)
    • 3.7Special inspections
    • 3.8Committee participation
  • Correction of Unsafe Conditions3
    • 3.9Remedy without delay
    • 3.10Reporting unsafe conditions
    • 3.11Emergency circumstances
  • Refusal of Unsafe Work3
    • 3.12Procedure for refusal
    • 3.12.1Reassignment of refused work
    • 3.13No prohibited action
  • Occupational First Aid9
    • 3.14Definitions
    • 3.15First aid attendant qualifications
    • 3.16Basic requirements
    • 3.17First aid procedures
    • 3.17.1Air transportation
    • 3.18Communication and availability
    • 3.19First aid records
    • 3.20Multiple employer workplaces
    • 3.21First aid attendant responsibilities
  • Young or New Workers4
    • 3.22Definitions
    • 3.23Young or new worker orientation and training
    • 3.24Additional orientation and training
    • 3.25Documentation
  • Joint Health and Safety Committees2
    • 3.26Evaluation of joint committees
    • 3.27Minimum training requirements for new joint committee members or worker health and safety representatives
  • Participation in Investigations1
    • 3.28Participation by employer or representative of employer and worker representative
  • Division 1 — Interpretation2
    • 1Definitions
    • 2First aid certificates
  • Division 2 — Minimum Requirements4
    • 3General minimum requirements
    • 4Dressing stations and first aid rooms
    • 5Overnight care
    • 6Emergency transportation
  • Buildings, Structures and Equipment14
    • 4.1Safe workplace
    • 4.1.1Avalanche risk assessment and safety plan
    • 4.1.2Avalanche risk assessment and safety plan exception
    • 4.2Safe buildings and structures
    • 4.3Safe machinery and equipment
    • 4.4Conformity to standards
    • 4.5Manuals and information
    • 4.6Reassembly
    • 4.7Information on rated capacity
    • 4.8Rated capacity
    • 4.9Inspection and maintenance records
    • 4.10Authorization
    • 4.11Startup
    • 4.12Circumvention of safeguards
  • Emergency Preparedness and Response6
    • 4.13Risk assessment
    • 4.14Emergency procedures
    • 4.15Repealed(repealed)
    • 4.16Training
    • 4.17Notification of fire departments
    • 4.18Notification of utility service providers
  • Impairment2
    • 4.19Physical or mental impairment
    • 4.20Impairment by alcohol, drug or other substance
  • Working Alone or in Isolation7
    • 4.20.1Definition
    • 4.20.2Hazard identification, elimination and control
    • 4.21Procedures for checking well-being of worker
    • 4.22Training
    • 4.22.1Late night retail safety procedures and requirements
    • 4.22.2Mandatory prepayment for fuel
    • 4.23Annual review of procedures
  • Workplace Conduct3
  • Violence in the Workplace5
    • 4.27Definition
    • 4.28Risk assessment
    • 4.29Procedures and policies
    • 4.30Instruction of workers
    • 4.31Advice to consult physician
  • Work Area Requirements11
    • 4.32Access to work areas
    • 4.33Arrangement of work areas
    • 4.34Restricted entry
    • 4.35Door installations
    • 4.36Glass
    • 4.37Restricted visibility
    • 4.38Extreme temperatures
    • 4.39Slipping and tripping hazards
    • 4.40Wet floors
    • 4.41Waste material
    • 4.42Cleaning with compressed air
  • Storing and Handling Materials4
  • Ergonomics (MSI) Requirements8
  • Work Area Guards and Handrails11
    • 4.54Definitions
    • 4.55Guardrail locations
    • 4.56Exceptions
    • 4.57Elevated workers
    • 4.58Specifications for guards and guardrails
    • 4.58.1Temporary removal of guardrails
    • 4.59Floor and roof openings
    • 4.60Toeboards
    • 4.61Walkways
    • 4.62Handrails on stairways
    • 4.63Vehicle travel areas
  • Illumination6
    • 4.64Definitions
    • 4.65Illumination levels
    • 4.66Means of illumination
    • 4.67Brightness, reflectance and glare
    • 4.68Illumination measurement
    • 4.69Emergency lighting
  • Indoor Air Quality11
    • 4.70Application
    • 4.71Submitting plans
    • 4.72Design and operation
    • 4.73Building modifications
    • 4.74Distribution
    • 4.75Balancing
    • 4.76Ventilation openings
    • 4.77Discharged air
    • 4.78Preventive maintenance
    • 4.79Investigation
    • 4.80Temperature and humidity
  • Environmental Tobacco Smoke and E-Cigarette Vapour4
  • Occupational Environment Requirements10
    • 4.84Eating areas
    • 4.85Washroom facilities
    • 4.86Change areas
    • 4.87Unsafe water
    • 4.88- 4.106Repealed
    • 1Scope
    • 2Definitions
    • 3Performance and material requirements
    • 4Engineering requirements
    • 5Installation and use requirements
  • Division 4 — Thermal Exposure1
  • General Requirements74
    • 8.2Responsibility to provide
    • 8.3Selection, use and maintenance
    • 8.4Workplace evaluation
    • 8.5Program
    • 8.6Annual review
    • 8.7Instruction
    • 8.8Supervisor's responsibilities
    • 8.9Worker's responsibilities
    • 8.10Personal clothing and accessories
    • 14.2Standards
    • 14.3Identification
    • 14.4Repealed(repealed)
    • 14.5Rated capacity indication
    • 14.6Repealed(repealed)
    • 14.7Boom angle indicator
    • 14.8Boom extension and load radius indicators
    • 14.9Logging exemption
    • 14.10Reeved-in devices
    • 14.11Support structure
    • 14.12Manual and instructions
    • 14.13Inspection, maintenance and repair
    • 14.14Inspection and maintenance records
    • 14.15Modifications
    • 14.16Certification required
    • 14.16.1Certification following misadventure
    • 14.17Access and egress
    • 14.18Audible warning
    • 14.19Drop stops
    • 14.20Rail end stops
    • 14.21Fenders
    • 14.22Securing pins
    • 14.23Boom stops
    • 14.24Molten metal
    • 14.25Repealed(repealed)
    • 14.26Sheave guards
    • 14.27Ungrounded supply
    • 14.28Controls
    • 14.29Operator protection
    • 14.30Cab windows
    • 14.31Operator's seat
    • 14.32Storage
    • 14.33Fire extinguisher
    • 15.2Qualified riggers
    • 15.3Detaching loads
    • 15.4Use of rigging
    • 15.5Component identification
    • 15.6Design factors
    • 15.7Wire rope on mobile cranes
    • 15.8Natural fibre rope
    • 15.9Wedge socket connections
    • 15.10Open hook restriction
    • 15.11Securing pins
    • 15.12Replacing pins
    • 15.13Repealed(repealed)
    • 15.14Securing ropes to drums
    • 15.15Wraps required
    • 15.16Reeving lines
    • 15.17Sheaves
    • 15.18Guylines
    • 15.19Spooling rope
    • 15.20Hand signals
    • 15.21Termination efficiencies
    • 15.22Wire rope clips
    • 15.23Wire rope splices
    • 15.24Restriction on fold back eyes
    • 15.25Wire rope rejection criteria
    • 15.26Nonrotating wire rope
    • 15.27Contact with electric arc
    • 15.28Welding
    • 15.29Hook rejection criteria
    • 20.1AQualified contractor
    • 20.2Notice of project
    • 20.2.1Notice of project — hazardous substances
    • 20.3Coordination of multiple employer workplaces
  • Safety Headgear3
    • 8.11General requirement
    • 8.12Use with all-terrain vehicles, snowmobiles and motorcycles
    • 8.13Use with bicycles and skates
  • Eye and Face Protection5
  • Limb and Body Protection3
    • 8.19General requirement
    • 8.20Cleaning or replacement
    • 8.21Leg protection
  • Footwear2
    • 8.22General requirement
    • 8.23Slippery surfaces
  • High Visibility and Distinguishing Apparel2
    • 8.24High visibility apparel
    • 8.25Distinguishing apparel
  • Buoyancy Equipment5
    • 8.26When required
    • 8.27Compliance with standards
    • 8.28Working alone
    • 8.29Record of inspection and maintenance
    • 8.30Retroreflective material
  • Flame Resistant Clothing1
  • Respirators19
    • 8.32When respirator required
    • 8.33Selection
    • 8.34Maximum use concentration
    • 8.35IDLH or oxygen deficient atmosphere
    • 8.36Emergency escape respirators
    • 8.37Respirable air quality
    • 8.38Corrective eyewear
    • 8.39Face seal
    • 8.40Fit tests
    • 8.41User seal check
    • 8.42Medical assessment
    • 8.43Optional use
    • 8.44Records
    • 8.45Maintenance and inspections
    • 1Scope
    • 2Definition
    • 3Types of leg protection
    • 4General requirements
    • 5Cut-resistance testing protocol and performance requirements
  • Personal Protective Equipment and Other Precautions11
    • 11.1Definitions
    • 11.2Obligation to use fall protection
    • 11.3Fall protection plan
    • 11.4Selection of harness or belt
    • 11.5Equipment standards
    • 11.6Anchors
    • 11.7Temporary horizontal lifelines
    • 11.8Certification by engineer
    • 11.9Inspection and maintenance
    • 11.10Removal from service
    • 11.11- 11.40Repealed
  • Division 1 — General3
  • Division 2 — Ladders3
    • 13.4Manufactured ladders
    • 13.5Position and stability
    • 13.6Use restrictions
  • Division 3 — Work Platforms6
    • 13.7Access
    • 13.8General requirements
    • 13.9Lines supporting work platforms
    • 13.10Hooks and clamps
    • 13.11Engineering required
    • 13.12Removal from service
  • Division 4 — Scaffolds7
  • Division 5 — Movable Work Platforms16
    • 13.20Marking of the equipment
    • 13.21Manuals
    • 13.22Maintenance of records
    • 13.23Testing
    • 13.24Work platforms on wheels
    • 13.25Warning devices on elevating work platforms
    • 13.26Controls on elevating work platforms
    • 13.27Cranes and hoists used to suspend work platforms
    • 13.28Two-blocking
    • 13.29Hoisting and lowering work platforms
    • 13.30Lift truck mounted work platforms
    • 13.31Powered platforms
    • 13.32Work in high risk situations
    • 13.33Fall protection
    • 14.1Definitions
    • 14.1.1Application
  • Equipment Operation25
  • Bridge, Gantry and Overhead Travelling Cranes6
  • Pneumatically Powered Hoists and Winches2
    • 14.59Pneumatically powered hoists
    • 14.60Repealed(repealed)
  • Manually Powered Hoists2
  • Mobile Cranes, Boom Trucks and Sign Trucks11
  • Tower Cranes24
  • Construction Material Hoists4
  • Chimney Hoists34
    • 14.116Permission to use
    • 14.117Certification
    • 14.118Support structures
    • 14.119Load rating
    • 14.120- 14.132Repealed
    • 1Scope
    • 2Definitions and interpretation
    • 3General requirements
    • 4Certification after alteration
    • 5Emergency stopping devices
    • 6Safety factors
    • 7Drive restrictions
    • 8Brakes
    • 9Terminal stopping devices
    • 10Speed governor
    • 11Equipment condition
    • 12Cage markings
    • 13Load restrictions
    • 14Cage layout and guarding
    • 15Fall protection at landings
    • 16Guarding at the lower landing
    • 17Instructions for use and maintenance
    • 18Chimney hoist must be in good condition
    • 19Operator training and authorization
    • 20Daily testing
    • 21Attending the controls
    • 22Communication with the operator
    • 23Backup communication plan
    • 24Persons or materials
    • 25Getting in or out of the cage
    • 26Hoisting speed
    • 27Position of gates
    • 28Emergency evacuation
    • 15.1Definitions
  • Slings12
  • Wire Rope Slings4
  • Alloy Steel Chain Slings6
  • Synthetic Web Slings3
    • 15.52Sling identification
    • 15.53Temperature restriction
    • 15.54Synthetic web sling rejection criteria
  • Metal Mesh Slings2
  • Below-the-hook Lifting Devices4
  • Other Requirements1
  • General Electrical Requirements8
    • 19.2Repealed(repealed)
    • 19.3Poles and structures
    • 19.4Obstructions on poles
    • 19.5Informing workers
    • 19.6Service rooms
    • 19.7Space around equipment
    • 19.8Testing equipment
    • 19.9Insulated elevating work platform
  • Working on Low Voltage Electrical Equipment6
    • 19.10Disconnection and lockout
    • 19.11Warning signs
    • 19.12Working close to energized equipment
    • 19.13Identification of controls
    • 19.14Grounding portable equipment
    • 19.15Ground fault circuit interrupters
  • Working on High Voltage Electrical Equipment2
  • Working on De-energized High Voltage Power Systems6
  • Minimum Separation Distance to be Maintained from Energized High Voltage Electrical Equipment and Conductors8
    • 19.24Informing workers about high voltage electrical equipment and conductors
    • 19.24.1Minimum approach distance when working close to exposed electrical equipment and conductors
    • 19.24.2Minimum clearance distance when passing under exposed electrical equipment and conductors
    • 19.25Assurance in writing
    • 19.26Assurance not practicable
    • 19.27Specially trained
    • 19.28Emergency work
    • 19.29Authorization by owner
  • Tree Pruning and Falling near Energized Conductors7
    • 19.30Preliminary inspection
    • 19.31Work in a hazardous area
    • 19.32Qualifications
    • 19.33Site crew requirements
    • 19.34Limits of approach
    • 19.34.1Crossing the neutral conductor
    • 19.35Tree pruning and falling equipment
  • Control Systems5
    • 19.36General requirements
    • 19.37Programmable control systems
    • 19.38Automatic control systems
    • 19.39Remote control systems
    • 19.40Wireless remote control
  • Electrofishing4
    • 19.41General requirements
    • 19.42Repealed(repealed)
    • 19.43Manufacturer's instructions
    • 20.1Definitions
  • Washroom Facilities at Construction Sites2
    • 20.3.1Definitions
    • 20.3.2Toilets at specified construction sites
  • Safe Work Areas and Safe Access14
  • Bridges and Similar Structures2
  • Concrete Falsework and Formwork12
    • 20.16.1Definitions
    • 20.16.2Application
    • 20.17Worksite-specific plans required for specified formwork
    • 20.18Certification of worksite-specific plans by professional engineer
    • 20.19Continuity of engineering
    • 20.20Information for worksite-specific plans
    • 20.21Application drawings and supplementary instructions for flyforms
    • 20.22Flyform handling
    • 20.23Supervision
    • 20.24Equipment requirements
    • 20.25Concrete placing hazards
    • 20.26Inspections
  • Concrete Pumping34
  • Tilt-up Building Construction5
  • Concrete Pre-stressing and Post-tensioning12
    • 20.60General requirements
    • 20.61Signalling devices and restricted areas
    • 20.62Strand measuring
    • 20.63Guarding during pre-stressing operations
    • 20.64Deflecting devices
    • 20.65Detensioning and strand cutting procedures
    • 20.66Strand vises and hydraulic devices
    • 20.67Hydraulic equipment
    • 20.68Platform width
    • 20.69Blowouts
    • 20.70Tendon handling
    • 20.71Securing jacks
  • Open Web Joists and Trusses1
    • 20.72Erection instructions
  • Roof Work5
    • 20.73Repealed(repealed)
    • 20.74Crawl boards and ladders
    • 20.75Steep roof requirements
    • 20.76Chutes and hoists
    • 20.77Mechanical equipment
  • Excavations18
    • 20.78Work standards
    • 20.79Underground utility services
    • 20.80Removing nearby hazards
    • 20.81Sloping and shoring requirements
    • 20.82Timber shoring and grades
    • 20.83Safe shoring procedures
    • 20.84Repealed(repealed)
    • 20.85Trench support structures
    • 20.86Spoil piles
    • 20.87Entry and exit
    • 20.88Guarding
    • 20.89Excavation crossings
    • 20.90Excavated materials
    • 20.91Use of skips or buckets
    • 20.92Scaling and trimming
    • 20.93Height limitations
    • 20.94Positioning equipment
    • 20.95Water accumulation
  • Scaling Operations6
  • Marine Construction, Pile Driving and Dredging9
  • Demolition11
  • Work in Compressed Air2
  • Other Equipment16
Browse · Plumbline